Many companies see that the backup was successful and assume their data is safe. However, a successful run does not indicate whether the data can actually be restored, how long the restoration will take, or whether the restoration procedure is usable in the event of a failure or ransomware attack.
Read on if:
Backups are running, but no one regularly checks their status
You have never performed an actual restore test
You do not know which data can be restored and from which point (RPO)
You have not defined how quickly operations must be restored (RTO)
Your backups are stored in only one location
The system performing the backups is managed by a former employee or external contractor
You do not have a documented restore procedure
You do not know whether your backups would survive ransomware or a server loss
Management, an auditor, or a customer requires proof that your data can be restored

What can go wrong
A successful backup run only indicates that the system was able to create a backup. It does not confirm that this backup is usable for recovery. Problems can include, for example:
Some files or databases are not included in the backup
The backup job runs, but the data is corrupted
No one checks backup consistency
The password or encryption key for the backups is unknown
It is unclear in what order systems should be restored
The backup storage is also accessible from the corporate network
You have never restored a backup from the cloud
The basic questions to ask in this situation are:
Can we restore operations from the existing backups when needed?
How quickly can we restore operations, and how much data will we lose?
How we proceed
1. Audit current backup jobs
We assess:
What is being backed up, when, and where
How long backups are retained
Who has access to the storage and backup system
Whether backups are encrypted
Whether multiple copies of backups exist in different locations
Depending on the environment, we can address workstations, physical and virtual servers, Microsoft 365, databases, NAS, and other critical services.
2. Determine what is critical for the business
Not all data has the same importance. Together, we define:
Which systems must be restored first in case of failure
Which data is critical for operations
How much data the company can afford to lose at most
How long the company can be out of operation
Which applications depend on each other and in what order they must be restored
This establishes a foundation and realistic recovery objectives: RPO and RTO.
RPO (Recovery Point Objective) tells us how much data we can afford to lose. It defines the maximum amount of data the company can lose in an incident.RTO (Recovery Time Objective) tells us how long the company can be out of operation. It covers the entire recovery process: detecting the problem, preparation, restoring data and systems, verifying functionality, and handing back to users.3. Verify backup status
We review:
Results of backup jobs
Error states and alerts
Age of the last usable backup
Storage availability
Backup retention rules
Encryption
Separation of access
Protection against deletion or modification of backups
4. Perform a restore test
Tests will (by agreement) include:
Restoring a file or folder
Restoring a virtual server
Restoring a database
Restoring a workstation
Restoring a server
Restoring from a local copy
Restoring from remote or cloud storage
We always plan restore tests with you in advance so that operations are not jeopardized. The results will be properly documented. We will state what was restored, from which point, how long the restore took, and whether any issues occurred.
5. Prepare recommendations and remediation plan
If we identify problems during recovery, we prioritize them:
Critical – address immediately
Important – address in the next project
Recommended – address in the longer term
This may involve, for example:
Adding a second or separate backup copy
Implementing encryption
Changing retention rules
Adjusting monitoring
Creating a DR (disaster recovery) procedure
What you gain
An overview of what is actually being backed up
Confirmation of whether critical data can be restored
Results of the restore test
Measured restore times where tested
A list of identified risks
Prioritized recommendations
A documented restore procedure
A proposal for further testing
Inputs for a DR plan
The result is not just confirmation that “backups are working,” but information on whether they are usable when a failure, error, attack, or other incident occurs.
Why Czech IT
We do not evaluate backups merely by the green checkmark next to a backup job. The purpose of backup is subsequent recovery, planned in advance to meet RTO and RPO, thereby minimizing impact on company operations.
We deliver results in the form of documentation and recommendations so you know what is protected, how data is restored, and who the key contacts are in case of an incident.